10 January 2024 | Written by: Amplex Group
The Aldoga Substation project contributes to the expansion of electricity infrastructure in Queensland, to meet the growing demand for power supply. Situated in the Gladstone region, the Aldoga Substation supports the growth of both manufacturing and renewable energy industries, with the purpose of increasing the capacity of the electricity network to meet the demands of existing and future developments.
Both the Aldoga Substation and the Aldoga GEM Facility received their electrical needs through Amplex, including a range of low-voltage and medium-voltage cables, as well as termination supplies. Amplex supported the development of this project with fast delivery times and low minimum order quantities on our cables, ensuring the project could be delivered in the most efficient manner.
MV Nylon Power Cables, LV Nylon Power Cables, Earth Cables, Power Cables, Control Cables, Crimp Lugs, Fibre Optic Cable